Summit Logistics managed the handling of a three-phase reactor arriving from Italy via the Port of Trois-Rivières. The unit was delivered by barge and carefully transferred using cranes onto SPMT equipment before being transported to our Sorel facility.
The operation included offloading, transfer, and placement onto storage blocks for several months, all executed under controlled conditions.
Barge operations, crane lifts, and SPMT movements were fully orchestrated by Summit, with precise timing aligned to the arrival of the international vessel, ensuring a seamless and delay-free execution.
This project is one of the many mandates that VCR has given us over the year. In fact, we wanted to thank them for their confidence in Summit to deliver their large-scale transports."